Getelec Collectivités
Martinique

Case Study

Needs

As part of its exemplary approach and to serve as a showcase, Getelec Collectivités Martinique wanted to conduct their own energy accounting to optimize their:

Global energy expenses

16 900 €/year

(or 96 836 kWh/year)

Vehicle
fleet’s gas consumption

22 013 €/year (or 12 727 L/year).

Solutions

Energaya studied the possibility to build and use photovoltaics as a private energy source, through a feasibility study, an improvement program, and an economic report

Step 1: Feasibility study

Energaya analyzed the company’s avenues to build and exploit a photovoltaics power station on Getelec Collectivités site.

Step 2: Improvement program and economic report

Build a photovoltaic power station

To reduce the site’s energy spendings.

Cost: 219 885 €

Savings: 59.75 % of the current energy spendings, taking into account future electric vehicle charging needs.

Emissions avoided : 28 tons/year of CO2 (-59.75 %)

Installation of backup batteries

To provide 3–5 hours of power in the event of an electricity outage.

Cost: 65 000 €​​

Installation of 8 charging points for company electric vehicles

To reduce fuel costs by using the solar photovoltaic energy generated on-site.

Cost: 9 500 €

Installation of a Building Management System (BMS)

To monitor and manage the solar photovoltaic plant along with the charging stations.

Results

This exemplary project combines optimized solar power generation, electrical backup through battery storage, fleet electrification, and smart vehicle charging.